The new Code of Practice for Ironwork Systems Installation and Refurbishment was introduced in May 2017.
Published by the Road Surface Treatments Association (RSTA), and peer-reviewed and endorsed by, amongst others, Highways England and Adept, the Code is designed to “provide practical guidance on avoiding early life failure and to achieve a high quality installation and a high quality repair.” It was developed by the industry for the industry and is intended to promote the best standards of design, materials and installation methods.
Currently, the service life expectation and specification guidance for the installation and refurbishment of ironworks varies greatly across the UK, and existing guidance often covers products and components in isolation. Through the introduction of an industry-wide code of practice, minimum standards of product quality and practice can be established, giving a greater level of assurance to clients, contractors and users.
Under typical conditions, the cost of materials and components used in the installation of ironworks equates to approximately 20% of the overall project [1] - it is traffic management, installation and reinstatement of surfacing that attracts the largest costs. Failure of ironworks installations due to poor workmanship results in greatly increased costs. It makes sense therefore to adopt the practice of ‘right first time’. The new Code of Practice will help to reinforce this message and lead to better and longer-lasting ironwork installations.
The Code of Practice is a comprehensive, easy-to-follow guide which is relevant to all designers, manufacturers and installers in the road improvements industry. It includes a detailed description of common indicators of failing installations; recommendations for ironwork specification and selection; and a useful checklist, encouraging best practice prior to, during and after works have been completed.
Howard Robinson, Chief Executive, Road Surface Treatments Association said:
"As the focal point for the road maintenance sector, the RSTA and its members are well-placed to provide overall industry best practice guidance. This new code is part of a growing knowledge centre for successful road work and maintenance. To ensure its validity the Code took three years to develop and I would like to thank those members involved for their valued input and feedback.
"Since its launch in May, the Code has been well-received by the industry. This Code fully explains what is expected from the client and from the contractor. It is all about using best practice to get it right first time".
Wayne Perrin, Business Development Manager for IKO PLC, a member of the RSTA, has been actively involved in the development of the new Code of Practice: “The ‘right first time’ approach put forward will lead to better and longer-lasting ironwork installations.”
For further information, visit www.rsta-uk.org.
References
- [1] RSTA. (May 2017). Code of Practice for Ironwork Systems Installation and Refurbishment. p. 5
[edit] Related articles on Designing Buildings Wiki
- Bituminous mixing and laying plant.
- Britain's historic paving.
- Conservation of Architectural Ironwork.
- Highway drainage.
- Highway infrastructure and local authorities.
- Highways England.
- Highways.
- Ironwork.
- Manual of Contract Documents for Highway Works.
- Overview of the road development process.
- Pavement.
- Road construction.
- Road joints.
- Runway construction.
- Transport design and health.
- Types of road and street.
Featured articles and news
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.
CIOB Client Guide (2nd edition) March 2025
Free download covering statutory dutyholder roles under the Building Safety Act and much more.
Minister quizzed, as responsibility transfers to MHCLG and BSR publishes new building control guidance.
UK environmental regulations reform 2025
Amid wider new approaches to ensure regulators and regulation support growth.
BSRIA Statutory Compliance Inspection Checklist
BG80/2025 now significantly updated to include requirements related to important changes in legislation.